The stadium’s recent renovation, carried out from 2016 to 2018, represents a major step forward, including in terms of sustainability.
The new Generali Arena
A win for Austria Wien
The new Generali Arena
A win for Austria Wien
![](https://www.bg-graspointner.com/_Resources/Persistent/f/6/3/c/f63c2d262856d514891a51a097e2e225c8de27f1/02.jpg)
In addition to the stadium itself, the stadium site, featuring state-of-the-art infrastructure, also has two training fields, a tube connection, a kindergarten, an academy area, offices, a museum and more.
![](https://www.bg-graspointner.com/_Resources/Persistent/a/a/a/d/aaadbd4f6cdfc4536764e1c5e6bf25f354b4518b/05.jpg)
... and a more energy-efficient lighting system was installed. This new system has a significantly higher lux number. At the same time, light pollution affecting nearby areas was eliminated.
![](https://www.bg-graspointner.com/_Resources/Persistent/6/5/1/a/651ae618f682397fc6877a9215d39d46c744090b/06.jpg)
The largest photovoltaic system to be used by any Austrian football club was installed on the roofs. With total capacity of 340 kW, the system meets the stadium's energy needs – apart from the powerful floodlights, of course.
![](https://www.bg-graspointner.com/_Resources/Persistent/3/b/2/c/3b2cafb5730ef52ad9c30263367305ef357f4593/09.jpg)
FILCOTEN® pro and FILCOTEN® tec systems are deployed to drain the 10,000 sqm of asphalt on the grounds.
![](https://www.bg-graspointner.com/_Resources/Persistent/1/0/a/9/10a97dc3282bfb570e363a1bfb1aa3a974a94a67/10_01.jpg)
Visual highlight: the playing field is surrounded by a strip of artificial turf in purple – the club's colour.
![](https://www.bg-graspointner.com/_Resources/Persistent/1/4/f/a/14fa871eb087421bcc90d4b5120e7f56b1e50ce5/01%20%283%29.jpg)
The stadium’s recent renovation, carried out from 2016 to 2018, represents a major step forward, including in terms of sustainability.
![](https://www.bg-graspointner.com/_Resources/Persistent/f/6/3/c/f63c2d262856d514891a51a097e2e225c8de27f1/02.jpg)
In addition to the stadium itself, the stadium site, featuring state-of-the-art infrastructure, also has two training fields, a tube connection, a kindergarten, an academy area, offices, a museum and more.
![](https://www.bg-graspointner.com/_Resources/Persistent/a/a/a/d/aaadbd4f6cdfc4536764e1c5e6bf25f354b4518b/05.jpg)
... and a more energy-efficient lighting system was installed. This new system has a significantly higher lux number. At the same time, light pollution affecting nearby areas was eliminated.
![](https://www.bg-graspointner.com/_Resources/Persistent/6/5/1/a/651ae618f682397fc6877a9215d39d46c744090b/06.jpg)
The largest photovoltaic system to be used by any Austrian football club was installed on the roofs. With total capacity of 340 kW, the system meets the stadium's energy needs – apart from the powerful floodlights, of course.
![](https://www.bg-graspointner.com/_Resources/Persistent/7/b/f/a/7bfa559f134ed84dfd48e85831cf907f1229ec4a/WIPE_kreis.png)
Using hydraulic calculations we proved that our channels deliver the required hydraulic performance. And we were able to advise and support the client in various ways.
![](https://www.bg-graspointner.com/_Resources/Persistent/7/e/e/e/7eee8b39b12901f59cb972a05211f6f1e41bcf1c/BOLE_kreis.png)
The BG-Graspointner solution won us over because it met all our requirements. From hydraulic calculations and cross-sections to safety, load-bearing capacity and sustainability."