NÁRODNÝ FUTBALOVÝ ŠTADIÓN

Kick-Off in Bratislava

Slovakia’s new National Stadium in Bratislava is located at the same site as its predecessor, but this new facility has a much more sophisticated drainage concept.

<p><strong>A three-cornered stadium</strong><br>With capacity for 22,500 spectators, the newly built stadium is home to the Slovak soccer club ŠK Slovan Bratislava. It offers WiFi, security monitoring technology, and studios for television broadcasting. Condominiums, offices, a shopping center, and a hotel have also been integrated to enhance its utility and attractiveness. Situated next to the main grandstand, the hotel building forms one of the four corners of the stadium facility, which of course also has underground parking (996 spaces) and direct connections to public transportation. </p><p> </p><p><strong>A plateau of challenges</strong><br>The stadium is now surrounded by a plateau structure for pedestrian and vehicle traffic where stadium visitors can gather, and it leads into the stadium. This road doubles as an access for police, fire department, and other security vehicles. The remarkable structure also doubles as a roof construction covering the parking lots and delivery driveways. It additionally plays a key role in the stadium’s emergency evacuation route planning, and all these factors together led to special requirements regarding drainage.</p><p> </p><p><strong>Clear evacuation routes</strong><br>An emergency evacuation plan is only effective if the evacuation routes are not flooded by water, even with heavy rainfall. Pavol Le&scaron;ko, who planned the drainage concept for the stadium, paid special attention to details. His clever idea: to install a floor drain every two meters. Thus a total of 680 floor drains (and the same number of dirt traps) provide for surface drainage. Accumulating water is evenly channeled into seepage and holding layers, into the roof drains and ultimately right into the stadium’s retention system. But even with terrific functionality, design remains crucially important. The grates for the BG-Graspointner channels employed fit perfectly into the visual appearance of the paved roof construction. </p><p> </p><p><strong>Reinforcement on the sideline</strong><br>Thought was given as well to the possibility of thermal expansion resulting from major temperature fluctuation. The channels were encased in concrete to protect them against the effects of excessive force exerted upon them through the layer of block paving. Attention was also given in planning and installation to ensuring the correct number and positioning of expansion joints.</p><p> </p><p><strong>One solution for everything: FILCOTEN HPC</strong><br>This project required a flexible drainage concept, and thanks to our line of FILCOTEN HPC drainage systems, an answer was found to every challenge. Both BG-FILCOTEN tec and BG-FILCOTEN pro pro were installed on the plateau, and BG-FILCOTEN pro was used for the connecting roads, where greater load-bearing capacity is required. The ideal solution for the stadium’s bus stop was BG-FILCOTEN one: a single-piece channel with no grate that is especially low-noise when driven over by vehicles. Another advantage of the product is its ease of maintenance. BG-FILCOTEN light was installed on the connecting footpaths and in the shopping mall. In total, more than 2.400 meters of channels made of FILCOTEN HPC (High Performance Concrete) were laid.</p><p> </p><p><strong>Support during every project phase</strong><br>We provided technical support on the entire drainage project and closely cooperated with the planning team to devise the best possible solution to meet every requirement. Pavol Le&scaron;ko:</p>
Because of the versatility afforded by BG-Graspointner’s FILCOTEN HPC product line, the choice was an easy one to make. And the environmentally friendly properties of FILCOTEN HPC make it possible to construct truly sustainable drainage systems. That was precisely the approach I wanted to take for the new National Stadium.
<p><strong>Are you working on a project with complex drainage requirements? Our specialists will be pleased to advise you. Just call us at </strong></p><p><br>Tel: +43 (0)6233 8900-0<br>E-Mail: <a href="mailto:office@bg-graspointner.com">office@bg-graspointner.com</a><br>Web: <a href="http://www.bg-graspointner.com">www.bg-graspointner.com</a></p>

Project overview

 

Project name

NFŠ, Národný futbalový štadi

 

Location

Bratislava

 

Installed channel types

BG-FILCOTEN light NW100

for BG-FILCOTEN tec NW 100 

BG-FILCOTEN pro NW 100 

BG-FILCOTEN pro G NW150

BG-FILCOTEN pro G mini NW300 

BG-FILCOTEN one NW150 

 

Total installed length in meters

2,423 m

 

Services BG-Support

Hydraulic calculations, project support

 

Client/builder 

NFŠ, a.s.

 

BG-Project team:

Ing. Peter Wirth, Ing. Juraj Medveď, PhD.

 

Architect/Planer

Ing. arch. Karol Kállay, Ing. Stanislav Fekete, Ing. arch. Milan Paulik, Ing. Pavol Leško

 

Building contractor

STRABAG Pozemné a inžinierske staviteľstvo (Strabag), s. r. o., Ing. Juraj Holubica

Peter Wirth
Manager
BG-Graspointner s.r.o.