Sketch of the Erste Campus, the Erste Group’s new headquarters in Vienna. It was the architects Henke Schreieck’s goal to create a building with an organic, natural design.
Project report Erste Campus Vienna.
A curvy challenge.
Project report Erste Campus Vienna.
A curvy challenge.
Developing the Erste Campus was a real challenge. The curve-shaped building required drainage channels with corresponding grates.
Here you can see the building’s irregular shape. How to install regular, straight channel bodies and grates with this curved shape? Simply cutting regular grates to fit would damage the galvanizing...
This is where BG’s support and engineering stepped in. Individual layout plans were created for all channels and angles. As you can tell from the size of the building, there were quite a few...
These were used as a basis for technical drawings. In a number of steps, individually fitted grates were handcrafted and galvanized – for a total of 200 channel bodies installed on different levels…
An extremely efficient drainage system perfectly adjusted to the building’s curved shape was created. Elegance and functionality in perfect harmony.
Here you can see the different levels of the building – all of which were equipped with customized drainage bodies and grates.
An extensive roof design on the different levels of the roof is a key to creating a green building complex. The Erste Campus isn’t only a new building for Vienna’s skyline, it’s a piece of nature and sustainability – also thanks to BG Graspointner.
Sketch of the Erste Campus, the Erste Group’s new headquarters in Vienna. It was the architects Henke Schreieck’s goal to create a building with an organic, natural design.
Developing the Erste Campus was a real challenge. The curve-shaped building required drainage channels with corresponding grates.
Here you can see the building’s irregular shape. How to install regular, straight channel bodies and grates with this curved shape? Simply cutting regular grates to fit would damage the galvanizing...
This is where BG’s support and engineering stepped in. Individual layout plans were created for all channels and angles. As you can tell from the size of the building, there were quite a few...
These were used as a basis for technical drawings. In a number of steps, individually fitted grates were handcrafted and galvanized – for a total of 200 channel bodies installed on different levels…
An extremely efficient drainage system perfectly adjusted to the building’s curved shape was created. Elegance and functionality in perfect harmony.
style="color: #9ed300">Project profile
Project name
Project report Erste Campus Vienna.
Location
Vienna, Austria
Challenge
Challenge: Enabling maximum sustainability of the building
Installed channel types
BG-FILCOTEN® light mini
BGFILCOTEN® light
BG-FILCOTEN® pro
steel channels BG-FA unilaterally perforated
Total running meters
over 2000
Servicesby BG-Support
Services by BG-Support: On-site measurements, creating technical drawings, development of special solutions
Specialchallenge
Special challenge: A circular building with straight channel bodies, including grates. Individually manufacturing and installing 200 fully galvanized custom grates.
Builder
Builder: Erste Campus Immobilien GmbH & Co KG
BG-Support-Team
Krexhammer Valentin Wieninger, Peter Ablinger, Christian
BG trading partners
Quester, Wiener Neustadt
Architects
Henke Schreieck Architekten ZT GmbH
Building contractor
Granit Oeynhausen
Valentin Krexhammer
Sales Management