There is rock on one side of the road, and a sloping embankment on the other side.
The cost-efficient way to make road shoulders safe.
BG-ROAD LEFIX side-strip slab
The cost-efficient way to make road shoulders safe.
BG-ROAD LEFIX side-strip slab
EA concrete bed with constructive steel reinforcing ensures that the LEFIX® side-strip slabs are connected securely to the asphalt.
After applying the bearing and the cover layers, the ground was brought in line with the embankment.
The road construction project, including 50 cm-wide, solid and safe side-strip slabs, was completed after only nine weeks.
EA concrete bed with constructive steel reinforcing ensures that the LEFIX® side-strip slabs are connected securely to the asphalt.
This product is perfect for the K 2098 project. A full extension would have been possible as an alternative, but this would have cost about two million euros for 1,300 meters of road.
Rubble verges are out of the question as they would start sagging after a short period of time. Some projects use grass verges. However, they don’t provide the smooth connection to the asphalt road surface, which means the construction will become unstable sooner or later. At some point, grass verges will sag or break.
The trafficable LEFIX® side-strip slabs are uniquely suited to reinforce the roadside; the continuous length reinforces the asphalt edge and ensures stability in the long run – even on the embankment.
This produces less debris, which significantly lowers the costs. After all, the disposal of potentially contaminated material is particularly expensive.
Project overview
Project name
K 2098 Lohmühle-Stangenbach
Location
Heilbronn, Germany
Installed channel types
BG-ROAD LEFIX® shoulder slab
Total installed length in meters
1300 m
Services BG-Support
Karl-Heinz Gramlich
Client/builder
Thomas Conrad
BG-Project team:
Karl-Heinz Gramlich
Planer
LRA Heilbronn Mr. Conrad
Building contractor
Wolff&Müller Niederlassung Künzelsau
Karl-Heinz Gramlich
Director Product
Management